A Flood Alert was issued for Tidal flooding near the South Humber Bank from Whitton to South Ferriby in North Lincolnshire on 28th October 2026. Affected watercourses included the The Humber.
During this event, FloodRadar monitoring gauges recorded notable rises. The West Clough at Brough West Clough rose 0.93m, peaking at 2.58m, while the Fleet Drain at Hessle climbed 0.88m.
Environment Agency advice issued
There is no longer a threat of flooding. Tidal conditions are expected to improve and no flooding is expected. We will continue to monitor the situation and will issue further alerts or warnings if necessary. Continue to take care on waterside roads and footpaths and don't put yourself in unnecessary danger. Stay away from floodwater; it may hide manholes, sewage and chemicals.
Monitoring gauges during this event
| Station | River | Rise | Peak |
|---|---|---|---|
| Brough West Clough | West Clough | +0.93m | 2.58m |
| Hessle | Fleet Drain | +0.88m | 1.71m |
| Barton on Humber | Barton Haven | +0.20m | 0.37m |
| Hull Hessle Astral Close | Western Drain | +0.07m | 0.38m |