A Flood Alert was issued for Humber estuary from Spurn Point to Winestead Outfall in East Riding of Yorkshire between 26th and 28th October 2026. Affected watercourses included the Humber Estuary, Winestead Drain.
During this event, FloodRadar monitoring gauges recorded notable rises. The Winestead Drain at Winestead Booster Pumping Station rose 0.58m, peaking at -0.03m, while the Buck Beck at Humberston climbed 0.29m.
Environment Agency advice issued
There is no longer a threat of flooding, though standing water and debris may still remain. Tidal conditions are expected to improve and no flooding is expected. We will continue to monitor the situation and will issue further alerts or warnings if necessary. Continue to take care on waterside roads and footpaths and don't put yourself in unnecessary danger.
Monitoring gauges during this event
| Station | River | Rise | Peak |
|---|---|---|---|
| Winestead Booster Pumping Station | Winestead Drain | +0.58m | -0.03m |
| Humberston | Buck Beck | +0.29m | 2.20m |
| Skeffling Pumping Station | Skeffling Drain | +0.20m | 0.79m |
| Stone Creek | Keyingham Drain | +0.13m | 0.32m |
| Patrington Haven Outstrays | Winestead Drain | +0.11m | 0.82m |
| River Freshney Grimsby | Laceby Beck | +0.08m | 0.23m |
| Burstwick Hall Road Bridge | Burstwick Drain | +0.07m | 0.85m |
| Laceby | Laceby Beck | +0.06m | 0.13m |