A Flood Alert was issued for Humber estuary from Spurn Point to Winestead Outfall in East Riding of Yorkshire on 12th September 2026. Affected watercourses included the Humber Estuary, Winestead Drain.
During this event, FloodRadar monitoring gauges recorded notable rises. The Winestead Drain at Winestead Booster Pumping Station rose 0.59m, peaking at 0.07m, while the Buck Beck at Humberston climbed 0.20m.
Environment Agency advice issued
There is no longer a threat of flooding, though standing water and debris may still remain. Coastal conditions are expected to improve and no flooding is expected. We will continue to monitor the situation and will issue further alerts or warnings if necessary. If you have been evacuated only return to your property once the emergency services have advised that it is safe to do so. Never drive through flood water, just 30cm of fast flowing water is enough to move your car.
Monitoring gauges during this event
| Station | River | Rise | Peak |
|---|---|---|---|
| Winestead Booster Pumping Station | Winestead Drain | +0.59m | 0.07m |
| Humberston | Buck Beck | +0.20m | 1.94m |
| Skeffling Pumping Station | Skeffling Drain | +0.19m | 0.80m |
| Stone Creek | Keyingham Drain | +0.13m | 0.23m |