Home › Flood Events › Christchurch Harbour
Flood Alert

Flood Alert: Christchurch Harbour - 28th October 2026

📍 Bournemouth, Christchurch and Poole 🌊 English Channel 📅 28 October 2026

A Flood Alert was issued for Christchurch Harbour in Bournemouth, Christchurch and Poole on 28th October 2026. Affected watercourses included the English Channel.

During this event, FloodRadar monitoring gauges recorded notable rises. The River Stour at Iford Bridge rose 1.20m, peaking at 1.15m, while the Danes Stream at New Valley Road climbed 0.12m.

Environment Agency advice issued

There is no longer a threat of flooding. The previous tide of concern has now passed, the weather is more settled and no flooding is expected. We will continue to monitor the situation and will issue further alerts or warnings if necessary. Continue to take care on waterside roads and footpaths and don't put yourself in unnecessary danger.

Monitoring gauges during this event

StationRiverRisePeak
Iford Bridge River Stour +1.20m 1.15m
New Valley Road Danes Stream +0.12m 0.13m
Knapp Mill River Avon +0.11m 0.37m
Hurn Court Moors River +0.08m 0.42m
Chewton Glen Walkford Brook +0.07m 0.18m
Throop River Stour +0.06m 0.54m

This report is automatically compiled from Environment Agency flood warning records and FloodRadar river-level monitoring data. Figures are observed gauge readings during the event period. This is a historical record, not a live warning — always check current flood warnings and gov.uk.