Ditton WwTW

Sign in to save

Storm overflow run by Southern Water, discharging into The River Medway.

Storm tank at sewage treatment works Maidstone and Malling constituency
Right now
Not discharging
Last discharge ended on (24 days ago).
Times are UK time. Company feed updated just now

"Not discharging" means the company's monitor reports no discharge right now — not that the water is clean. The feed publishes status only; no discharge volume is measured.

2026 so far
23spills
at least 20 h discharging on 22 days · live feed, before 28 Feb via Top of the Poops, not yet official · 2 discharges whose end the feed did not report (counted, no hours)
2025 official
0spills
0 h · same as 2024
Rank in Southern Water
#797
of 970 overflows by 2025 spills (1 = most)
Monitor in 2025
100% working
Long-term average 0.5 spills a year

Year by year

The Environment Agency's official annual returns, counted the EA's way (12/24-hour spills). 2026 is our own running count, the same way, from the live feed: our own log of it begins on 28 February, and the discharges before that are Top of the Poops' record of the same feed. The feed reports only each overflow's latest discharge, so a discharge it moved past before we saw it end is counted as one spill with no hours: the hours are a floor. The official figure is published next spring.

2020
no data
2021
0 spills · 0 hmonitor 100%
2022
1 spill · 0.5 hmonitor 100%
2023
1 spill · 1.6 hmonitor 96.3%
2024
0 spills · 0 hmonitor 99.7%
2025
0 spills · 0 hmonitor 100%
2026so far
23 spills · at least 20 h

A spill is the EA's 12/24-hour count: the first 12 hours of a discharge count as one, each further 24 hours with discharge as one more. "Monitor" is the share of that year the monitor was working, so a 0 beside a working monitor is a real zero; "no data" means the monitor produced no usable data that year — not zero. Years before 2024 are matched to this site by name and location, because the EA's site IDs changed that year; a monitor figure beside one of them means the outlet's permit confirms the match.

2020 was the first year every company reported for all its monitored overflows, with monitors still being installed through the year: a 2020 figure covers the share of the year the monitor was working, shown beside it, and an overflow with no 2020 bar had no return that year.

What the 2025 return says

From Southern Water's annual return to the Environment Agency for this overflow.

High-spill review
High spill threshold not met
Investigation
No investigation activity in reporting period
Improvement work
No improvement action in reporting period
Monitored since
2017
Water body
MEDWAY

"High spill threshold not met" means this overflow did not spill often enough to trigger the EA's formal high-spill review for that year. It is not a statement that the spills were harmless.

Discharges we have recorded

25 discharge periods since 24 Apr 2023, 2 whose end the feed never gave. Recorded from the live status feed only — Southern Water has not published an event-level log we hold, so this is what the feed has shown us, not a complete record. The official annual count is the figure to quote.

Show 15 earlier
StartedEndedDischarge time
not captured, before not captured
50 min
25 min
50 min
46 min
35 min
42 min
52 min
59 min
54 min
1 h 30 min
1 h 11 min
1 h 3 min
1 h 21 min
1 h 35 min

The year figures above use the EA's 12/24-hour counting method, so they are comparable with the official figures.

Look back by date

Discharge records held: from 31 Dec 2020.

Days run midnight to midnight, UK time, up to 366 days at a time. A discharge beside rain or a flood is a timing match, not proof of cause, and no volume is published.

What the feed showed

FloodRadar's own record of every change of state Southern Water's live feed has shown for this overflow, kept since : 6 states. The feed publishes its status now and its latest discharge, nothing older; the discharges above are read from this. It is here so the figures can be checked.

Show the last 6 states
SeenStatusSinceLatest discharge
Not discharging →
Not discharging →
Discharging → no end yet
Not discharging →
Discharging → no end yet
Not discharging →

Rain nearby last 30 days

Nearest live rain gauge: Rainfall gauge nr Ham Hill, 2.1 km away. Brown shading = when this overflow was discharging; ▼ = a discharge start.

Overflow shading is a timing match, not proof of cause — heavy rain and spills share a trigger. Times come from the water company’s event-duration monitor (site status only; no discharge volume is published).

Where it is

Nearest river gauge
Allington Lock (River Medway) · 3.3 km
Nearest rain gauge
Council area
Tonbridge and Malling District (B)
Southern Water's own name for it
Ditton SSO - 115933
Site reference
SWS00252 · permit W00022
Coordinates
51.30488, 0.46200

Tell me when this overflow discharges

One message when the company's monitor reports a new discharge here. At most one every 6 hours.

Setting this alert needs JavaScript. The alerts you already have are on your alerts page.

The alert repeats the monitor's status: whether the overflow is discharging, not how much or why. It can only tell you about a discharge that starts after you turn it on.

Concerned about this overflow?

Report pollution you can see or smell to the regulator straight away; the company handles complaints about the overflow itself.

Write to the MP

The Environment Agency's return places this overflow in the Maidstone and Malling constituency. An MP can ask the company and the regulator questions on a constituent's behalf. These words carry the official figures; change them as you like.

The link opens Parliament's own "Find your MP", which gives the MP's name and how to write to them. FloodRadar sends nothing and keeps nothing you write. Check the constituency against your own address: an MP acts only for people who live in it.

Live status: © Southern Water storm overflow activity data, licensed under CC BY 4.0. Annual spill figures: Environment Agency Event Duration Monitoring return, © Environment Agency copyright and/or database right, Open Government Licence (OGL) v3.0. Discharges marked "via Top of the Poops", and this year's figures before 28 February, come from Top of the Poops' record of the same company feed, used under CC BY-SA 4.0: the feed's own start and end times as its pages print them, not their derived hours. Times are shown in UK local time. FloodRadar republishes the monitor's status and the EA's figures; it does not measure discharges itself. Constituency and council area from the EA's return: contains OS data © Crown copyright and database right 2026.