GROUNDWATER BOREHOLE · EA
FAARN COMBE A
Sign in to saveA borehole the Environment Agency uses to measure groundwater in the Upper Greensand aquifer. Levels are in metres above Ordnance Datum (mAOD).
Latest level
126.56 mAOD as of
No normal for this month is held for this borehole yet.
Read by an automatic logger, usually every day; the Environment Agency publishes these levels in batches, often weeks apart.
The last year
Loading the levels…
One line, the average of each day.
About this borehole
- Aquifer
- Upper Greensand
- Borehole depth
- 115 m
- Datum
- 141.56 m, as recorded by the Environment Agency
- Opened
- 2 Aug 1973
- Status
- Active
- EA reference
- 994cbc14-0a4a-4ef6-b0fe-6a4462204bfd
Nearby boreholes
- FAARN COMBE B Sign in to save 0.0 km · 121.88 mAOD as of 22 Nov 2026
- Baydon Hole Sign in to save 1.6 km · 130.40 mAOD as of 22 Nov 2026
- Fognam Down, Upper Greensands Sign in to save 2.3 km · 119.89 mAOD as of 22 Nov 2026
- Fognam Down, Chalk Sign in to save 2.3 km · 122.72 mAOD as of 22 Nov 2026
- Bockhampton Sign in to save 2.5 km · 117.86 mAOD as of 22 Nov 2026
Boreholes with a level in the last 30 days, nearest first.
All groundwater boreholes on the map →
Groundwater levels: Environment Agency Hydrology API, © Environment Agency and/or database right 2026, Open Government Licence v3.0.