A Flood Warning was issued for River Witham and River Bain between Woodhall Spa to Tattershall in Lincolnshire on 1st March 2026. Affected watercourses included the River Witham, River Bain.
During this event, FloodRadar monitoring gauges recorded notable rises. The River Witham at Langrick Bridge rose 2.05m, peaking at 2.85m, while the River Witham at Chapel Hill climbed 1.87m.
Environment Agency advice issued
High river levels are expected to cause flooding today. Flooding is expected on 01 March 2026 . Limited rainfall is forecast over the next several days. River levels will remain high until water makes its way through the catchment following recent rainfall. We are closely monitoring the situation . Avoid low lying roads near rivers, which may be flooded . This message will be updated by 5:00PM on 02 March 2026 or as the situation changes.
Monitoring gauges during this event
| Station | River | Rise | Peak |
|---|---|---|---|
| Langrick Bridge | River Witham | +2.05m | 2.85m |
| Chapel Hill | River Witham | +1.87m | 2.70m |
| Kirkstead Bridge | River Witham | +1.70m | 2.63m |
| Bracebridge | River Witham | +0.99m | 1.53m |
| Bardney | River Witham | +0.86m | 2.28m |
| Stamp End Sluice | River Witham | +0.65m | 1.10m |
| Kirkby On Bain | River Bain | +0.45m | 0.99m |
| Fiskerton Sluice | River Witham | +0.33m | 0.55m |
| Goulceby | River Bain | +0.25m | 0.50m |
| Horncastle Victoria Mill | River Bain | +0.20m | 0.65m |