Flood Warning: River Rede at Otterburn Mill and Brownchesters Farm - 12th March 2026

📍 Northumberland 🌊 River Rede 📅 12 March 2026

A Flood Warning was issued for River Rede at Otterburn Mill and Brownchesters Farm in Northumberland on 12th March 2026. Affected watercourses included the River Rede.

During this event, FloodRadar monitoring gauges recorded notable rises. The River Rede at Otterburn Mill rose 3.63m, peaking at 3.95m, while the River North Tyne at Bellingham climbed 1.96m.

Environment Agency advice issued

High river levels are expected to cause flooding this evening.  Flooding is expected on 12 March 2026 .  Locations most affected will be Properties at Otterburn Mill and Brownchesters Farm.  We are monitoring rainfall and river levels .  Start acting on your flood plan if you have one . Activate any flood protection products you may have.  This message will be updated by 10:00PM on 12 March 2026 or as the situation changes. 

Monitoring gauges during this event

StationRiverRisePeak
Otterburn Mill River Rede +3.63m 3.95m
Bellingham River North Tyne +1.96m 2.06m
Rede Bridge River Rede +1.68m 2.01m
Alwinton Bridge River Coquet +0.91m 1.17m
Middleton Bridge River Wansbeck +0.76m 0.86m
Falstone River North Tyne +0.64m 0.71m
Ugly Dub River North Tyne +0.48m 0.77m
Shilmoor Usway Burn +0.33m 0.39m

This report is automatically compiled from Environment Agency flood warning records and FloodRadar river-level monitoring data. Figures are observed gauge readings during the event period. This is a historical record, not a live warning — always check current flood warnings and gov.uk.