HomeFlood Events › Groundwater flooding in the upper Avon v
Flood Warning

Flood Warning: Groundwater flooding in the upper Avon valley and the Nine Mile river - 3rd March 2026

📍 Wiltshire 🌊 Groundwater 📅 3 March 2026

A Flood Warning was issued for Groundwater flooding in the upper Avon valley and the Nine Mile river in Wiltshire on 3rd March 2026. Affected watercourses included the Groundwater.

During this event, FloodRadar monitoring gauges recorded notable rises. The Groundwater Level at Windwhistle rose 2.07m, peaking at 76.25m, while the Groundwater Level at Homington climbed 1.74m.

Environment Agency advice issued

High groundwater levels are expected to cause flooding. Groundwater on the Salisbury Plain remain high. Areas that could be affected include: Upper Avon Valley and the Nine Mile River. The groundwater level at Everleigh borehole is at 131.18m, and remains reactive to further rainfall. Residents are advised to prepare property resilience measures and ensure that pumps are working where they have been installed. Residents may experience inundation of septic tanks and sewer systems. Properties may experience flooding in cellars in affected areas. Flooding of roads is expected, take particular car

Monitoring gauges during this event

StationRiverRisePeak
Windwhistle Groundwater Level +2.07m 76.25m
Homington Groundwater Level +1.74m 69.87m
Oakley Industrial Estate Groundwater Level +1.07m 94.20m
Stoford Cross Groundwater Level +0.91m 71.04m
Everleigh Groundwater Level +0.90m 131.61m
Chitterne Down Groundwater Level +0.70m 100.33m
Clarendon Groundwater Level +0.47m 73.70m
Queen Manor Farm Groundwater Level +0.22m 70.84m
Hazelberry Plantation Groundwater Level +0.19m 126.77m

This report is automatically compiled from Environment Agency flood warning records and FloodRadar river-level monitoring data. Figures are observed gauge readings during the event period. This is a historical record, not a live warning — always check current flood warnings and gov.uk.