HomeFlood Events › Groundwater flooding for the Wylye Valle
Flood Warning

Flood Warning: Groundwater flooding for the Wylye Valley - 5th March 2026

📍 Wiltshire 🌊 Groundwater 📅 5 March 2026

A Flood Warning was issued for Groundwater flooding for the Wylye Valley in Wiltshire on 5th March 2026. Affected watercourses included the Groundwater.

During this event, FloodRadar monitoring gauges recorded notable rises. The Groundwater Level at Windwhistle rose 1.82m, peaking at 74.83m, while the Groundwater Level at Homington climbed 1.70m.

Environment Agency advice issued

Groundwater levels in Salisbury Plain are beginning to plateau but remain high. Areas that could be affected include: Kingston Deverill, Monkton Deverill, Hill Deverill, Longbridge Deverill, Crockerton, Norton Bavant, Heytesbury, Corton, Upton Lovell, Boyton, Sherrington, Stockton and Bapton. The groundwater level at the Tilshead MOD borehole is at 108.59m. We have had a few days of drier weather, but further rainfall is forecast starting tomorrow, Thursday 26 February, which may cause levels to rise once again into the weekend. Residents are advised to prepare property resilience measures and

Monitoring gauges during this event

StationRiverRisePeak
Windwhistle Groundwater Level +1.82m 74.83m
Homington Groundwater Level +1.70m 68.73m
Woodyates Groundwater Level +1.43m 100.72m
The Terraces Fonthill Groundwater Level +1.14m 115.33m
Oakley Industrial Estate Groundwater Level +0.94m 93.47m
Stoford Cross Groundwater Level +0.87m 70.41m
Chitterne Down Groundwater Level +0.58m 99.82m
Queen Manor Farm Groundwater Level +0.27m 70.71m
Musseldean Copse Groundwater Level +0.13m 134.90m

This report is automatically compiled from Environment Agency flood warning records and FloodRadar river-level monitoring data. Figures are observed gauge readings during the event period. This is a historical record, not a live warning — always check current flood warnings and gov.uk.