HomeFlood Events › Groundwater flooding for the Till
Flood Warning

Flood Warning: Groundwater flooding for the Till - 19th March 2026

📍 Wiltshire 🌊 Groundwater 📅 19 March 2026

A Flood Warning was issued for Groundwater flooding for the Till in Wiltshire on 19th March 2026. Affected watercourses included the Groundwater.

During this event, FloodRadar monitoring gauges recorded notable rises. The Groundwater Level at Windwhistle rose 0.53m, peaking at 69.09m, while the Groundwater Level at Stoford Cross climbed 0.49m.

Environment Agency advice issued

High groundwater levels are cause flooding. Groundwater levels in Salisbury Plain are beginning to fall but remain high. Areas that could be affected include: Tilshead, Orcheston, Shrewton and Berwick St James. The groundwater level at the Tilshead borehole is at 98.29m, and is expected to slowly fall. The forecast remains dry for the next 5 days. Residents are advised to prepare property resilience measures and ensure that pumps are working where they have been installed. Residents may experience inundation of septic tanks and sewer systems. Properties may experience flooding in cellars in af

Monitoring gauges during this event

StationRiverRisePeak
Windwhistle Groundwater Level +0.53m 69.09m
Stoford Cross Groundwater Level +0.49m 67.38m
The Terraces Fonthill Groundwater Level +0.37m 111.87m
Clarendon Groundwater Level +0.36m 71.30m
Oakley Industrial Estate Groundwater Level +0.30m 90.74m
Chitterne Down Groundwater Level +0.23m 97.92m
Queen Manor Farm Groundwater Level +0.23m 69.47m
Musseldean Copse Groundwater Level +0.10m 134.45m
Everleigh Groundwater Level +0.09m 128.58m

This report is automatically compiled from Environment Agency flood warning records and FloodRadar river-level monitoring data. Figures are observed gauge readings during the event period. This is a historical record, not a live warning — always check current flood warnings and gov.uk.