Flood Warning: Groundwater flooding for the Iwerne - 2nd March 2026

📍 Dorset Council 🌊 Groundwater 📅 2 March 2026

A Flood Warning was issued for Groundwater flooding for the Iwerne in Dorset Council on 2nd March 2026. Affected watercourses included the Groundwater.

During this event, FloodRadar monitoring gauges recorded notable rises. The Groundwater Level at Ridge Way rose 1.69m, peaking at 80.96m, while the Groundwater Level at Woodyates climbed 1.69m.

Environment Agency advice issued

High groundwater levels are expected to cause flooding. The groundwater level at the Iwerne Hill Farm borehole is at 112.02m, levels are starting to fall steadily but still remain high.. This week will be dry except Thursday and drier conditions continue into the weekend. Areas that could be affected include: Iwerne Minster. Residents are advised to prepare property resilience measures and ensure that pumps are working where they have been installed. Residents may experience inundation of septic tanks and sewer systems. Properties may experience flooding in cellars in affected areas. Flooding

Monitoring gauges during this event

StationRiverRisePeak
Ridge Way Groundwater Level +1.69m 80.96m
Woodyates Groundwater Level +1.69m 102.42m
Iwerne Hill Farm Groundwater Level +1.35m 112.58m
Delcombe Wood Groundwater Level +1.33m 140.24m
The Terraces Fonthill Groundwater Level +0.78m 116.11m
Badbury Rings Groundwater Level +0.76m 37.31m
Doles Ash Groundwater Level +0.55m 122.00m
Horton Inn Groundwater Level +0.45m 41.97m
Ashmore Groundwater Level +0.32m 134.85m
Musseldean Copse Groundwater Level +0.27m 135.17m