HomeFlood Events › Groundwater flooding for the Avon valley
Flood Warning

Flood Warning: Groundwater flooding for the Avon valley from Amesbury to the north of Salisbury - 5th March 2026

📍 Wiltshire 🌊 Groundwater 📅 5 March 2026

A Flood Warning was issued for Groundwater flooding for the Avon valley from Amesbury to the north of Salisbury in Wiltshire on 5th March 2026. Affected watercourses included the Groundwater.

During this event, FloodRadar monitoring gauges recorded notable rises. The Groundwater Level at Windwhistle rose 1.82m, peaking at 74.83m, while the Groundwater Level at Homington climbed 1.70m.

Environment Agency advice issued

Groundwater levels in Salisbury Plain are beginning to plateau but remain high. Areas that could be affected include: Avon Valley including Amesbury, Great Durnford, Upper Woodford, Middle Woodford and Lower Woodford. The groundwater level at Stoford Cross borehole has fallen slightly to 71.43m. We have had a few days of drier weather, but further rainfall is forecast starting tomorrow, Thursday 26 February, which may cause levels to rise once again into the weekend. Residents are advised to prepare property resilience measures and ensure that pumps are working where they have been installed.

Monitoring gauges during this event

StationRiverRisePeak
Windwhistle Groundwater Level +1.82m 74.83m
Homington Groundwater Level +1.70m 68.73m
Odstock Groundwater Level +1.06m 62.11m
Oakley Industrial Estate Groundwater Level +0.94m 93.47m
Stoford Cross Groundwater Level +0.87m 70.41m
Everleigh Groundwater Level +0.86m 130.98m
Chitterne Down Groundwater Level +0.58m 99.82m
Clarendon Groundwater Level +0.47m 73.36m
Queen Manor Farm Groundwater Level +0.27m 70.71m

This report is automatically compiled from Environment Agency flood warning records and FloodRadar river-level monitoring data. Figures are observed gauge readings during the event period. This is a historical record, not a live warning — always check current flood warnings and gov.uk.