A Flood Alert was issued for The River Till in Lincolnshire between 28th February 2026 and 1st March 2026. Affected watercourses included the River Till, Cricket Till.
During this event, FloodRadar monitoring gauges recorded notable rises. The River Trent at Gainsborough rose 3.15m, peaking at 5.07m, while the River Trent at Torksey climbed 2.71m.
Environment Agency advice issued
River levels remain high following recent rainfall. Flooding is possible on the 1 March 2026. Locations most affected will be low lying land and roads near rivers. Our forecasts indicate that flooding to properties isn't likely and therefore flood warnings are not expected to be issued. We are closely monitoring the situation. Take care and avoid walking, cycling or driving through flood water. Avoid low lying roads, near rivers which may be flooded. This message will be updated by 5pm on 2 March 2026 or as the situation changes.
Monitoring gauges during this event
| Station | River | Rise | Peak |
|---|---|---|---|
| Gainsborough | River Trent | +3.15m | 5.07m |
| Torksey | River Trent | +2.71m | 6.01m |
| Squires Bridge | River Till | +2.66m | 3.87m |
| Lincoln Monson Street | Sincil Dyke | +1.86m | 2.88m |
| Fosdyke Jetty | Fosdyke Canal | +0.82m | 2.13m |
| Brayford Pool | River Witham | +0.79m | 1.06m |
| Stamp End Sluice | River Witham | +0.65m | 1.10m |
| Nettleham | Nettleham Beck | +0.33m | 0.56m |