A Flood Alert was issued for Humber estuary from Spurn Point to Winestead Outfall in East Riding of Yorkshire on 18th June 2026. Affected watercourses included the Humber Estuary, Winestead Drain.
During this event, FloodRadar monitoring gauges recorded notable rises. The Winestead Drain at Winestead Booster Pumping Station rose 0.50m, peaking at 0.07m, while the Buck Beck at Humberston climbed 0.30m.
Environment Agency advice issued
High tides may lead to flooding. Flooding is possible from 08:00am to 09:30am on Thursday 18th June. Locations most affected will be coastal roads and footpaths. We are closely monitoring the situation. Avoid coastal footpaths, which may be flooded. This message will be updated by 8:00pm on 18 June 2026 or as the situation changes.
Monitoring gauges during this event
| Station | River | Rise | Peak |
|---|---|---|---|
| Winestead Booster Pumping Station | Winestead Drain | +0.50m | 0.07m |
| Humberston | Buck Beck | +0.30m | 1.97m |
| Skeffling Pumping Station | Skeffling Drain | +0.20m | 0.80m |
| Stone Creek | Keyingham Drain | +0.10m | 0.14m |