A Flood Alert was issued for Groundwater flooding in the Salisbury Plain area in Hampshire, Wiltshire on 16th March 2026. Affected watercourses included the Groundwater.
During this event, FloodRadar monitoring gauges recorded notable rises. The Groundwater Level at Windwhistle rose 0.73m, peaking at 69.82m, while the Groundwater Level at Stoford Cross climbed 0.60m.
Environment Agency advice issued
Groundwater levels in the Salisbury Plain are continuing to recede. Levels are still high, flooding of fields and roads is still possible. Levels remain reactive to further rainfall. Where groundwater is near the surface, intense rainfall will lead to surface water flooding. We are closely monitoring the situation. Residents are advised to prepare property resilience measures and ensure that pumps are working where they have been installed . This message will be updated by 11:00AM on 23rd 2026 or as the situation changes.
Monitoring gauges during this event
| Station | River | Rise | Peak |
|---|---|---|---|
| Windwhistle | Groundwater Level | +0.73m | 69.82m |
| Stoford Cross | Groundwater Level | +0.60m | 67.98m |
| Clarendon | Groundwater Level | +0.39m | 71.68m |
| Oakley Industrial Estate | Groundwater Level | +0.37m | 91.12m |
| Chitterne Down | Groundwater Level | +0.25m | 98.18m |
| Queen Manor Farm | Groundwater Level | +0.25m | 69.72m |
| Hazelberry Plantation | Groundwater Level | +0.25m | 125.89m |
| Everleigh | Groundwater Level | +0.19m | 128.77m |
| Musseldean Copse | Groundwater Level | +0.10m | 134.55m |