HomeFlood Events › Groundwater flooding for the Till
Flood Warning

Flood Warning: Groundwater flooding for the Till - 4th March 2026

📍 Wiltshire 🌊 Groundwater 📅 4 March 2026

A Flood Warning was issued for Groundwater flooding for the Till in Wiltshire on 4th March 2026. Affected watercourses included the Groundwater.

During this event, FloodRadar monitoring gauges recorded notable rises. The Groundwater Level at Windwhistle rose 1.95m, peaking at 75.54m, while the Groundwater Level at The Terraces Fonthill climbed 1.13m.

Environment Agency advice issued

High groundwater levels are expected to cause flooding. Groundwater levels in Salisbury Plain are beginning to plateau but remain high. Areas that could be affected include: Tilshead, Orcheston, Shrewton and Berwick St James. The groundwater level at the Tilshead borehole is at 99.64m, and is expected to remain high. We have had a few days of drier weather, but further rainfall is forecast starting tomorrow, Thursday 26 February, which may cause levels to rise once again into the weekend. Residents are advised to prepare property resilience measures and ensure that pumps are working where they

Monitoring gauges during this event

StationRiverRisePeak
Windwhistle Groundwater Level +1.95m 75.54m
The Terraces Fonthill Groundwater Level +1.13m 115.61m
Oakley Industrial Estate Groundwater Level +1.00m 93.85m
Stoford Cross Groundwater Level +0.91m 70.75m
Everleigh Groundwater Level +0.87m 131.30m
Chitterne Down Groundwater Level +0.63m 100.07m
Clarendon Groundwater Level +0.46m 73.54m
Queen Manor Farm Groundwater Level +0.25m 70.80m
Musseldean Copse Groundwater Level +0.14m 135.01m

This report is automatically compiled from Environment Agency flood warning records and FloodRadar river-level monitoring data. Figures are observed gauge readings during the event period. This is a historical record, not a live warning — always check current flood warnings and gov.uk.