A Flood Alert was issued for Tidal flooding near the South Humber Bank from Whitton to South Ferriby in North Lincolnshire on 27th October 2026. Affected watercourses included the The Humber.
During this event, FloodRadar monitoring gauges recorded notable rises. The West Clough at Brough West Clough rose 0.98m, peaking at 2.64m, while the Fleet Drain at Hessle climbed 0.89m.
Environment Agency advice issued
High tides and forecast weather conditions tomorrow morning may lead to flooding. Flooding is possible from 05:30 to 08:30 on Wednesday 28th October. "This will lead to high tidal levels along the Humber Estuary. The high tides combined with strong winds may result in wind-blown spray and wave splash causing localised pooling of water behind the sea defences which may occur two to four hours either side of the high tide. If conditions deteriorate, the A1077 flood gate across the A1077 may be closed. A further message will be issued if this becomes apparent. Low lying coastal land and roads w
Monitoring gauges during this event
| Station | River | Rise | Peak |
|---|---|---|---|
| Brough West Clough | West Clough | +0.98m | 2.64m |
| Hessle | Fleet Drain | +0.89m | 1.71m |
| Barton on Humber | Barton Haven | +0.20m | 0.37m |
| South Cave Beverley Road | South Cave Beck | +0.05m | 0.27m |