A Flood Alert was issued for Humber estuary from Spurn Point to Winestead Outfall in East Riding of Yorkshire on 11th September 2026. Affected watercourses included the Humber Estuary, Winestead Drain.
During this event, FloodRadar monitoring gauges recorded notable rises. The Skeffling Drain at Skeffling Pumping Station rose 0.17m, peaking at 0.80m, while the Buck Beck at Humberston climbed 0.16m.
Environment Agency advice issued
High tides today may lead to flooding. Flooding is possible from 5.30am to 8.30am Locations most affected will be low lying land and roads near rivers or on the coast. We are closely monitoring the situation . Take care and avoid walking, cycling or driving through flood water . This message will be updated by 09:00AM on 12 September 2026 or as the situation changes.
Monitoring gauges during this event
| Station | River | Rise | Peak |
|---|---|---|---|
| Skeffling Pumping Station | Skeffling Drain | +0.17m | 0.80m |
| Humberston | Buck Beck | +0.16m | 1.88m |
| Stone Creek | Keyingham Drain | +0.11m | 0.20m |